  • 印度古德洛尔ITPCL发电厂一期2×600MW亚临界燃煤机组项目(1).jpg

2×600MW subcritical coal-fired unit project of the first phase of ITPCL Power Plant in Goodlol, India

Category:

Project description


MESSAGES BOARD

Description

Detailed introduction:
 
Name: 2×600MW subcritical coal-fired unit of Phase I, ITPCL Power Plant, Goodlol, India
 
Unit capacity: 2 × 600MW
 
Unit category: subcritical coal-fired generating unit
 
Address: 25 km south of the city of Goodlol, India, close to the Bay of Bengal
 
The Gudrol coal-fired unit project in India was contracted by EPC of Shandong Electric Power Construction Co., Ltd. The boiler is two subcritical pressure coal-fired forced circulation drum boilers produced by Harbin Boiler Plant, single furnace, one intermediate reheat, balanced ventilation, open air layout and all steel frame structure. The steam turbine is two subcritical steam turbines produced by Dongfang Steam Turbine Works. It adopts eight-stage unadjusted extraction steam heating and regenerative system. The generator is a water-hydrogen-hydrogen cooled, static-excited turbo generator produced by Dongfang Electric Machinery Co., Ltd. Goodlol Project Our company is not only responsible for commissioning service projects such as DCS configuration, commissioning and performance testing, but also undertakes relay protection setting calculation. The relay protection setting calculation will adopt the latest IEEE/ANSI standard, national standard (GB), International Electrotechnical Commission (IEC) standard and International System of Unit (SI) standard, and use ETAP7.1 version software for analysis and calculation, and finally get accurate. And the calculation results approved by the owner. It shows that after nearly 7 years of development and growth, our company has strengthened its reputation, credibility and competitiveness in the same industry, and has far-reaching significance for improving our company's comprehensive service capability.
 
From the first batch of personnel of our company in February 2014, the main work that has been completed by the personnel on the website as of December 30, 2014 has been reversed. The main work in progress is BSCS TSCS MCS logic configuration and screen. Setting, boiler feed water PLC preliminary test, preparation before air compressor commissioning, air conditioning chilled water system test pump flushing, etc.

Fill out the form and we'll be in touch soon!

How we can help you?

SEND