Name: Saudi Arabia Rabigh IPP 2×660MW Sub-Critical Oi-Gas-Fired Power Station Project Unit Capacity: 2×660MW Unit Type: Sub-Critical Oil-Gas-Fired Power Station Location: Rabigh 57,Old Madina Road, K.S.A

On 15th, March, 2013, we got the technology service contract of Fangjiashan2×1000 MW Unit from China Nuclear Power Engineering Operation Management Co.,Ltd. This signifies the first nuclear unit commissioning of our company. The owner chose our company because we are a professional electric power commissioning company. Our work in the last year was acknowledged by the owner and our company was considered a model by our peers because of our professional competence and credit. The commissioning of QinshanFangjiashan(2X1000MW) Nuclear Station plays an important part in expanding our business market both at home and abroad, optimizing our commissioning structure and the long-term development of our company.

Project name: Iraq Salah ad-Din 2×630MW Subcritical Oil and Gas Fired Power Plant Commissioning Service Location: Salah ad-Din province, Iraq The project was a contract project signed by and betweenChina Machinery Engineering Corporation (CMEC) and Thermal Power Project Company of MinistryofElectricity in Iraq. The project is located 186 km north away from Baghdad, on the north bank of Tigris River in Salah ad-Din province. The project consists of two 630MW subcritical oil and gas units, and the boilers are drum boilers withsubcritical parameters, natural circulation, four tangential firing mode, one single reheat, single furnace, balanced ventilation and total steel frame. This project isanother largeoil and gas fired power plant project we got after Saudi Arabia Rabigh Project and another attempt at commissioning large gas fired boilers. This project once again proved the trust and acknowledgement the owner had for our company.

This project is an electric power station expansion project with an installed capacity of 1×135MW of Thailand National Electric Power Company. The project scale and nature is 1×98MWdouble extraction condensing steam turbine generator unit. There are steam turbine area, transformer area, water circulating pump room and forced draft cooling tower area, air conditioners of the steam turbine room and water circulating room, chemical dosing system and steam and water sampling system. This project ends with the completion of performance acceptance test with a timescale of 19 months. The project is located in 304 Industrial Park, Thatnoom, Prachinburi province, Thailand. Our company conducts the unit commissioning.

< 1234...12 >