Located in Zwar city, this project is invested by Saudi Arabia Saline Water Conversion Corporation (SWCC) and the project consists of a gas turbine combined circulation power plant and saline water conversion plant. The main designer is America SRL Company and the main equipment supplier is Siemens Group.
This project is located in Nangong City, Hebei province with newly built 130t/h vibration high-temperature high-pressure boiler and 1×30MW single-level steam extraction condensing steam turbine unit.
Our company won the bids for the GuonengXunxian and GuonengLuyi Bio-Energy Projects in April, 2007. They are both 1X30MW high-temperature, high-pressure straw-fired generator units invested by Guoneng Bio-Energy Co.,Ltd and designed by ShangdongLuneng Power Design Institute. The total investment is about RMB 0.28 billion and what separate these two projects from other projects are that this two projects is fired by the straws of wheat and maize and that about 200 thousand tons of straws are burned every year generating 0.13billion KWH.
The project is located in Bayan county, Heilongjiang province. The boiler is 130t/h vibration high-temperature high-pressure boiler and the generating unit is 1×30MW single-level steam extraction condensing steam turbine unit. The boiler is YG-130/9.2-T boiler manufactured by Jinan Boiler Group Co.,Ltd and the turbine is N30-8.83 turbine manufactured by Qingdao Jieneng Steam Turbine Group Co.,Ltd; the generator is 30MW QF-30-2 generator manufactured by Shangdong Jinan Power Equipment Factory Co.,Ltd with rated voltage being 10.5kV, rated current being 2062A and rated power factor being 0.8. Our company conducted the single system (engine) trial run, subsystem trial run and whole unit startup trial run. And the commissioning quality was rated Excellent.