尼日利亚Papalanto 8×42MW燃机电站工程
Description
Detailed introduction:
Name: Nigeria Papalanto 8×42MW Gas Turbine Power Station Project
Unit capacity: 8 × 42MW
Unit category: gas turbine generator set
Address: Papalando, Nigeria
The project is located in Ogun State, Nigeria, and is designed to install and install eight 42,000-kilowatt simple-cycle gas generators with a total capacity of 336,000 kilowatts. The Nigerian Papalando 8*42MW gas turbine power station project is a new construction project with a construction scale of 335MW. A total of 8 PG6581B gas turbine generator sets supplied by Nanjing Steam Turbine Motor (Group) Co., Ltd. (ISO working condition output 42.1MW) ), single cycle power generation. Eight gas turbines are juxtaposed, axially parallel, and open-air, with a spacing of 35m, and reserved for the expansion of the combined cycle site. The power plant is connected to the system with a voltage of 330kV, the main transformer enters the line 4 times, and the 330kV outlet line 4 times.
The project is invested by the National Electric Power Company of Nigeria (NEPA) and is under the overall construction of Shandong Electric Power Construction Third Engineering Company (SEPCO III). The company is responsible for the whole plant gas turbine, steam turbine, boiler, water, electricity, DCS, performance test, etc. Sub-system and complete set of debugging tasks. The EPC project of the Papalanto 8×42MW gas turbine power station project in Nigeria began to be commissioned in February 2007. In March 2008, the complete part of the system and the complete set of commissioning and commissioning projects were completed and handed over smoothly. Former Nigerian President Obasanjo delivered a speech at the launching ceremony of the Papalando gas turbine power station. "This is a world-class power plant built by the world-class power engineering company SEPCOIII." Project manager Fang Yibo became the first Chinese chief. It has caused great influence at home and abroad.
Previous article
Heilongjiang Yichun Domestic Waste Incineration Power Generation 1X12MW Unit Project
Nigeria Ogun 4×9EGT+4HRSG+2ST combined cycle unit project